The Costs can be monitored on the Schemes Panel / Cost reports at any time. These panels include the HA Pin number, HA Contact, Internal Project Manager:
At the completion of the Scheme, the Costs are validated - i.e. ensure all Cost Allocations are valid and present. It is possible to re-allocate Costs in order to correct mis-allocations. The Cost Reports give a full Cost Breakdown at all times.